RDB Composites LLC

RDB Composites LLCRDB Composites LLCRDB Composites LLC

RDB Composites LLC

RDB Composites LLCRDB Composites LLCRDB Composites LLC
  • Home
  • Repairs/Restorations
  • Repairs/Restorations
  • Accessories
  • Customers & finished boat
  • More
    • Home
    • Repairs/Restorations
    • Repairs/Restorations
    • Accessories
    • Customers & finished boat
  • Home
  • Repairs/Restorations
  • Repairs/Restorations
  • Accessories
  • Customers & finished boat

Major Clacka Restoration

Exterior

Exterior done

Exterior done

This Clacka needed a major restoration and a lot of repairs. The entire exterior needed to be sandblasted to remove this rough finish that was flaking off in spots, had runs in spots and was very rough to the touch. 

Exterior done

Exterior done

Exterior done

After it was sandblasted it was sanded smooth, all the chips, dings and major cracks and holes were repaired then it was primed and resprayed. 

Interior

Interior done

Interior done

The inside was in rough shape as well. This also had to be sandblasted to remove the old material. Some De-lamination was going on in several spots. This was also repaired. 

Interior done

Interior done

Interior done

Once the inside was cleaned up and repaired it was resprayed. The Rod holders were also cleaned up and glassed in. A new Rowers seat was installed and the "A" parts were repaired and resprayed to match the exterior 




Clacka Restoration

First Look

This Clacka was in for a complete inside and out repair and restoration

The Finished look

This is with the interor redone with an all "B" finish.

busted sheer roll at the transom

busted sheer roll at the transom

busted sheer roll at the transom

Yep Ouch!!!!

repaired and resprayed

busted sheer roll at the transom

busted sheer roll at the transom





Another look at the finished boat

Clacka Headhunter

In the shop ready for repairs

In the shop ready for repairs

In the shop ready for repairs

This Client wanted the Chines and Bottoms repaired. We also had to repair the front knee lock, install new seats, Buff and Wax the exterior and interior A parts.

Bottom and Chines

In the shop ready for repairs

In the shop ready for repairs

We had to do some repair work on the Chines and Bottom especially where the boat was sitting on the rollers from the trailer.

Bottom and Chines Done

In the shop ready for repairs

Bottom and Chines Done

The Bottom and Chines Repaired and Resprayed. The exterior has also been Buffed and Waxed. This brought back the shine in the gelcoat and got rid of the oxidation. 

Front Knee Lock

Front Knee Lock Repaired

Bottom and Chines Done

The Front Knee lock had some pretty significant damage and was in need of repair. We also replaced all the trimlock on the boat.

Front Knee Lock Repaired

Front Knee Lock Repaired

Front Knee Lock Repaired

The Front Knee Lock has been fixed. We resprayed the Front and Rear Knee Lock with gelcoat. 

Rowers Seat

Front Knee Lock Repaired

Front Knee Lock Repaired

The old Rowers Seat was a very uncomfortable metal seat. Ouch imangine sitting on that all day. 

New Rowers Seat

New Rowers Seat

New Rowers Seat

The old seat was removed and replaced with a much more user friendly one.

Seats

New Rowers Seat

New Rowers Seat

The old seats needed an upgrade.

Seats

All new Seats ready for a fun Day of Fishing!!

Ready To Go

 And here it is. All finished and ready to go. It is even sitting on a new trailer. The boat no longer rides on the rollers. It has Boat Buckle Tie downs. We also replaced the old Anchor Davit and installed the easy spin Rx. 

Clacka Repair

The Clackacraft

One of the many cracks

One of the many cracks

Our client wanted an interior respray, that needed some interior cracks fixed, buff and polish , chines fixed, and seats  replaced.  

One of the many cracks

One of the many cracks

One of the many cracks

We fixed many interior cracks and buffed and polished 

Fixed

One of the many cracks

Cracked rolled gunnel

All fixed up, resprayed and  polished up

Cracked rolled gunnel

Cracked rolled gunnel

Cracked rolled gunnel

We also fixed some major cracks in the rolled gunnel. Both sides

Repaired

Cracked rolled gunnel

Repaired

Repaired and resprayed

Trimlock

Cracked rolled gunnel

Repaired

The Trimlock needed replaced 

New Trimlock

inside cracks

inside cracks

We replaced all of the old Trimlock. We also reinforced the oar lock area and replaced the oar lock blocks

inside cracks

inside cracks

inside cracks

inside cracks

inside cracks

inside cracks

Repaired

Old foot release

inside cracks

Repaired

Old foot release

Old foot release

Old foot release

Old foot release

Old foot release

This Foot Release was wore out and needed to be replaced

New foot release

New foot release

New foot release

Seats

New foot release

New foot release

The seat cushions and seats were old, cracked and stained.

New seats

New foot release

New seats

Once we had the repairs done and the interior resprayed we replaced the seats.

Before

Before

New seats

One more look before the repair and restoration

One more look before the repair and restoration

After

Before

After

Fixed up and ready to go

Clacka Repair and respray

First look

Damaged areas

First look

This is a clacka that we did some repair work on and a respray. The Client wanted the White Gel Coat changed to Emerald Green.

Resprayed

Damaged areas

First look

After we repaired the chines and filled in the scratches and dings on the bottom and free-board we resprayed it to the color our client wanted.

Damaged areas

Damaged areas

Black Gel Refinish

Once this was sanded out we were able to get to the damaged areas and do the needed repairs and get it prepped for respray

Black Gel Refinish

Black Gel Refinish

The Black Gel Coat needed to be wet sanded and the bigger scratches filled

Black Gel Refinish

Black Gel Refinish

This has been filled, wet sanded, buffed,sealed and waxed

Before

Bottom and Chines Before

Before

After

Bottom and Chines Before

Before

Bottom and Chines Before

Bottom and Chines Before

Bottom and Chines Before

Bottom and Chines After

Bottom and Chines After

Bottom and Chines Before

Final Look

Bottom and Chines After

Final Look

Ready to Go!!

Clacka Repair and Respray

First look

This Clacka came in for an exterior respray and some interior work

Interior rear pedestal crack

The rear pedestal had a crack on the floor that needed to be addressed

Crack repaired

Crack repaired and resprayed with antiskid 

Done

Here it is all finished with a brand new pair of Sawyer Oars.

Ready to go

Repaired, resprayed and ready to go sitting on a New Adams Trailer.

The Tub repair

First look

Bottom, chines, and sides

Bottom, chines, and sides

Meet The Tub. This boat was in need of some serious restoration and repair. Cup holders, new anchor, anchor system,rope, Trim Lock, front leaner bar, new gel coat inside and out, new oar locks and blocks.

Bottom, chines, and sides

Bottom, chines, and sides

Bottom, chines, and sides

The bottom, chines and sides had some pretty major damage and needed repaired and the Client wanted a new color gel coat inside and out.

New Color

Bottom, chines, and sides

The inside.

After fixing all the damage, we also reinforced the rolled edges because a critical failure was about to happen. They were cracked and about ready to break completely. We gave this boat a new gel coat respray and brought life back to it. 

The inside.

The inside.

The inside.

The seats needed replaced. They were also cracked and in need of repair.

New Seats.

The inside.

Rod holder.

All fixed up. Cracks repaired, cup holders installed and trim lock. Also you can see the Dierks hand release side pull anchor system

Rod holder.

The inside.

Rod holder.

We made a new Rod holder for the clients this made them quite happy!

oar locks

Brand new oar locks

Brand new oar locks

New oar locks were needed. The rolled edges were about to break so they needed reinforced as well

Brand new oar locks

Brand new oar locks

Brand new oar locks

Nice new oar locks, blocks and Trim Lock. you can also see the Dierks hand release side pull anchor system

Drain hole

Brand new oar locks

New drain hole.

This was actually built up around the drain hole. This was sanded out and redone as well.

New drain hole.

New anchor system

New drain hole.

Now that this was done water would actually be able to drain out. Also you can see the new gel coat and webbing inside.

New anchor system

New anchor system

New anchor system

Here you can see the new anchor system that we installed. This is a Dierks hand release side pull. The new anchor for it is a Green Anchor.

Front leaner bar

New anchor system

New anchor system

Leaner bar installed and ready to go. This can be adjusted to the client so its a perfect fit.

The Tub

Presenting The Tub. Our Client was very happy with the results and as you can see Stich and DJ approve

Copyright © 2025 Fiberglass or Wood Drift Boat Repair - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept